Jesik Consulting completed a geotechnical site investigation and report for a 4-story senior apartment community. Variable soils were over-excavated by 3 feet, moisture conditioned, then re-compacted to provide uniform founding material for structural concrete slabs and footings. Pavement thickness cross sections were designed.

Construction included fill placement along a drainage to the left side of the building, retaining walls and a small putting green.