
Jesik Consulting & Engineering supported multiple public safety and fire facility projects with geotechnical engineering, construction materials testing, and construction-phase services. Work included projects for the City of Pueblo—such as Fire Stations 5, 6, 8, and 11—as well as construction-phase testing support for a fire station at Fort Carson. Services included geotechnical site investigations, subsurface analysis, foundation recommendations, pavement design, and drainage considerations, along with detailed reporting aligned with ASTM standards and project specifications.
During both new construction and existing facility evaluations, Jesik provided field services, testing, and quality documentation to support design and construction decisions. This included slab coring, subgrade sampling, compressive strength testing, and in-situ density testing, along with concrete testing and reporting during construction. The team delivered accurate data, practical recommendations, and consistent documentation to help ensure durable, code-compliant fire facilities and reliable long-term performance.